+ 386 (01) 56 15 200 info@alpeng.si

Biogas Jezera

 

Scope of work in which employees of Alpeng d.o.o. have participated: design for obtaining construction permit, detail design and as-built design,  trial operation.

Specifications: 

daily production of biogas 10.800 Nm3/dan
electric power konegacije 1000 kW
daily transmitting electricity into the public grid do 22.660 kWh/day
start of operation 2011
investment cost 5 mio EURO