+ 386 (01) 56 15 200 info@alpeng.si

Wastewater treatment plant Domzale - Kamnik

Reconstruction and upgrading of existing plant.
Scope of work in which employees of Alpeng d.o.o. have participated: design for obtaining construction permit and detail design, supply and installation of the major part of technological equipment, trial operation.

Specifications: 

capacity 149.000 PE
dry weather flow 1.500 m³/h
wet weather flow 2.200 m³/h
cleaning concept SBR
treatment level N, DN, P
sludge loading 0,061 kgBPK5/kgSSd
start of operation 2016
investment cost 11 mio EURO