Wastewater treatment plant Gornja Radgona
Scope of work in which employees of Alpeng d.o.o. have participated: design for obtaining construction permit and detail design, supply and installation of technological and electrical equipment, trial operation.

Specifications:
capacity | 8.800 PE |
---|---|
dry weather flow | 144 m³/h |
wet weather flow | 222 m³/h |
cleaning concept | SBR |
treatment level | N, DN, P |
sludge loading | 0,046 kgBPK5/kgSSd |
start of operation | 2014 |
investment cost | 3,3 mio EURO |