Wastewater treatment plant Kranj
Reconstruction and upgrading of existing plant.
Scope of work in which employees of Alpeng d.o.o. have participated: design for obtaining construction permit and detail design, supply and installation of the major part of technological equipment.

Specifications:
capacity | 95.000 PE |
---|---|
dry weather flow | 1.118 m³/h |
wet weather flow | 2.736 m³/h |
cleaning concept | conventional plant with pre-denitrification |
treatment level | N, DN, P |
sludge loading | 0,08 kgBPK5/kgSSd |
start of operation | 2015 |
investment cost | 24 mio EURO |