+ 386 (01) 56 15 200 info@alpeng.si

Wastewater treatment plant Kranj

Reconstruction and upgrading of existing plant.
Scope of work in which employees of Alpeng d.o.o. have participated: design for obtaining construction permit and detail design, supply and installation of the major part of technological equipment.

Specifications: 

capacity 95.000 PE
dry weather flow 1.118 m³/h
wet weather flow 2.736 m³/h
cleaning concept conventional plant with pre-denitrification
treatment level N, DN, P
sludge loading 0,08 kgBPK5/kgSSd
start of operation 2015
investment cost 24 mio EURO