Wastewater treatment plant Radece
Reconstruction and upgrading of existing plant.
Scope of work in which employees of Alpeng d.o.o. have participated: detail design, partial supply and installation of technological equipment, trial operation.

Specifications:
capacity | 3.000 PE |
---|---|
dry weather flow | 75 m³/h |
wet weather flow | 131 m³/h |
cleaning concept | conventional plant with pre-denitrification |
treatment level | N, DN, P |
sludge loading | 0,058 kgBPK5/kgSSd |
start of operation | 2014 |
investment cost | 1,1 mio EURO |