Wastewater treatment plant Retece
Scope of work in which employees of Alpeng d.o.o. have participated: design for obtaining construction permit and detail design, supply and installation of all technological and electrical equipment, trial operation.

Specifications:
capacity | 2.400 PE |
---|---|
dry weather flow | 53 m³/h |
wet weather flow | 96 m³/h |
cleaning concept | conventional plant with pre-denitrification |
treatment level | N, DN, P |
sludge loading | 0,05 kgBPK5/kgSSd |
start of operation | 2014 |
investment cost | 1,1 mio EURO |